Heavy Construction – China Construction America Fri, 24 Apr 2026 15:47:06 +0000 en-US hourly 1 https://wordpress.org/?v=4.6.20 Rehabilitation of I-278 Bridges Achieves Final Completion /news/rehabilitation-of-i-278-bridges-achieves-final-completion/ /news/rehabilitation-of-i-278-bridges-achieves-final-completion/#respond Thu, 12 Nov 2020 16:14:50 +0000 http://www.chinaconstruction.us/?p=2411 Continue reading "Rehabilitation of I-278 Bridges Achieves Final Completion"]]> For the past two months, the project team, craft labor and the subcontractors have been working diligently to perform all punch list items and improvement work that the owner added via change orders. In addition, all seasonal landscaping, which is part of the final beautification program and can only take place between Sept. 15 and Nov.15, was completed on time.

天美传媒 Civil rose to the challenge during the COVID-19 pandemic pushing through to successful completion. Filled with pride of ownership, the project team worked safely and collaboratively with all stakeholders with the utmost professionalism to deliver a final quality product that will serve the public for many decades.


79th Street Bridge over I-278

]]> The Wittpenn Bridge鈥檚 main lift span is a steel orthotropic bridge deck measuring 325 feet long and 110 feet wide 鈥� almost as large as a football field. It consists of three sections that weigh approximately 700 tons each. Given the colossal weight and scale of the steel deck, the project team utilized the Donjon Chesapeake 1000 crane (Chessy), the largest heavy lift crane on the east coast with 1,000 tons in lifting capacity and 231 feet in boom length, to perform the erection work. Intensive pre-planning and coordination with the New Jersey Department of Transportation, subcontractors, vendors and work crews ensured a safe and precise operation.

Located in Jersey City and Kearny in Hudson County, the Wittpenn Bridge serves as a major connector between Routes 139 and 1 and 9T to the east, and the New Jersey Turnpike Interchange 15W and Newark/Jersey City Turnpike to the west. 天美传媒 Civil鈥檚 job is to replace the 90-year-old bridge with a new one south of the existing bridge. In the closed position, the Wittpenn Bridge鈥檚 newly constructed vertical lift span will provide a minimum vertical clearance of 70-foot above water versus the existing bridge鈥檚 35-foot clearance over the Hackensack River, minimizing the need to lift the bridge and improving vehicular and marine traffic flows.

]]>  

]]>
MTA Metro-North Yankees-E. 153rd Street Station /project/yankee-stadium-train-station/ Tue, 19 Jul 2016 15:35:28 +0000 http://www.chinaconstruction.us/?post_type=project&p=641  

]]>
MTA West 8th Street Station /project/mta-west-8th-street-station/ Tue, 19 Jul 2016 15:40:00 +0000 http://www.chinaconstruction.us/?post_type=project&p=653  

]]>
Nassau Airport Gateway /project/nassau-airport-gateway/ Tue, 14 Feb 2017 21:58:23 +0000 http://www.chinaconstruction.us/?post_type=project&p=1428 Pulaski Skyway /project/pulaski-skyway-deck-replacement/ Mon, 18 Jul 2016 18:14:26 +0000 http://www.chinaconstruction.us/?post_type=project&p=598 Shore (Belt) Parkway Bridge over Gerritsen Inlet /project/shore-belt-parkway-bridge-over-gerritsen-inlet/ Tue, 19 Jul 2016 15:23:40 +0000 http://www.chinaconstruction.us/?post_type=project&p=639  

]]>
Staten Island Expressway /project/staten-island-expressway/ Tue, 19 Jul 2016 15:01:28 +0000 http://www.chinaconstruction.us/?post_type=project&p=631  

]]>